What you’ll study
-
Max and Min VAV air portions not proven on drawings.
-
Linear diffusers create drifts and luxury issues.
-
Versatile duct set up issues
-
Un-balanced duct branches.
-
Interconnecting duct loop preparations.
-
Ceiling Return issues.
-
Diffusers dumping air at low stream
-
Mild troffers inflicting drafts and luxury issues.
-
Stress dependent VAV system issues.
-
VAV terminal field operates with decreased capability.
-
VAV terminal field operates with decreased capability.
-
Flex duct set up issues.
-
Flex duct set up issues.
-
Diffusers create drafts and luxury issues.
-
Diffusers create drafts and luxury issues
-
Extreme duct leakage causes issues.
-
Inadequate air stream from a VAV terminal field.
-
Terminal packing containers don’t open
-
Terminal packing containers don’t shut.
-
Steam Humidifiers soak ducts.
-
Duct Humidifiers trigger water to gather in ducts.
-
Smudging happens round ceiling diffusers.
-
Terminal packing containers and diffusers generate noise.
-
Excessive humidity happens in courthouse occupancy.
-
Improperly sized diffusers.
-
Inadequate smoke management in VAV methods.
Put up expires at 4:05pm on Sunday January twenty ninth, 2023